top of page

Electrical Systems
The Risk of Improper Installation:
Why LV/MV Engineering is Essential?
A poorly designed Electrical Project or a Medium Voltage Installation that doesn't meet standards (NBR 5410/IEC) compromises safety and leads to financial losses due to constant maintenance. We offer a complete solution, taking care of all stages, from design to final commissioned delivery, ensuring Energy Efficiency and Legal Compliance.
Why E.S.A is the Best Choice for LV/MV Projects?
A flawed Electrical Design or a Medium Voltage Installation without compliance (NBR 5410/IEC) is the leading cause of short circuits, fires, production downtime, and equipment loss. Without technical rigor, you risk serious accidents and fines.
We offer a complete solution, managing every stage, from the executive design to the final commissioning, ensuring Energy Efficiency and NR-10 Safety.

Our Electrical Design and Installation Services
Comprehensive Services for your Electrical System (LV/MV)
Executive and Detailed Design
Development of floor plans, single-line or multi-line diagrams, cable sizing, protection calculations, and selectivity for Low and Medium Voltage (LV/MV).
Substation Expertise
Substations and E-Houses: Planning, assembly, and commissioning of Indoor and Simplified Substations, ensuring total compliance with local utility standards.
Installation and Assembly (LV/MV)
Assembly and execution: Installation of Electrical Panels, Main Distribution Boards (MDBs), and MCCs; infrastructure construction (cable trays, conduits, and busways) with industrial-grade robustness.
Legal Compliance and Standards
NR-10 and NR-12 Compliance: Guarantee that the installation complies with NR-10 (Electrical Safety) and the execution of Compliance Projects (NR-12) for machinery and panels.
Grounding and Protection
Grounding Systems and LPS: Development and implementation of high-performance Grounding Systems, minimizing risks from atmospheric discharges and voltage surges.
Power Generation
Generator Projects: Backup Power Generation solutions to ensure operational continuity (hospitals, data centers, industries) in case of utility failure.
Why E.S.A is the Best Choice for LV/MV Projects?
-
Technical Rigor and Certification: All projects and reports are signed by specialized engineers, with ART (Technical Responsibility Annotation) registered at CREA.
-
Efficiency and Savings: Projects focused on load optimization and loss reduction, ensuring the best return on investment (ROI).
-
100% Compliance: Projects and installations in total obedience to NBRs (Brazilian Standards) and specific utility regulations.
bottom of page
